Some modern playground equipment installations are sophisticated structures. We are pleased to have been able to help Tayplay to develop their range of innovative equipment.
For the most part these structures use a combination of tensile (rope) and compressive (stainless steel tube) elements, anchored to mass concrete foundation blocks.
An Active 4000 Pyramid, with test weights suspended.
Load cell at anchor point.
A Levitator structure under test
Load cell at anchor point.
In this instance a weekness was discovered and subsequently strengthened before going into production.