The Castlemilk Towers

The Castlemilk Towers stand on the road side of the Castlemilk Brae, the B766.
The installation was designed by Doug Cocker for the Castlemilk Environment Trust and installed in 1999.
The towers stand some 6.4m tall, being built using 8 of 0.8m segments of grey granite. The Granite was sourced from China and worked by Bon Accord Granite. The stones are strengthened by steel sections attached to a reinforced concrete foundation.

Get In Touch

Dalchully, Laggan, Inverness-shire PH20 1BU Scotland, UK

E: info@adac-structures.co.uk

T: +44 (0) 1528 544 201

M: +44 (0) 7841 502 990

S:  adac-structures

© ADAC Structures, 2019. ©ADAC (Engineering Services ) Ltd. 2019. All rights reserved.
ADAC-structures is the trading name of ADAC (Engineering Services ) Ltd.